1,149 issued permits in Upper West Side (Central), part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,149 permits
Combine apartments #720 and #723 on the seventh floor as per tppn 3-97 of a mixed use residential and commercial building, as per plans submitted. not constitute any change in use,…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Modify plumbing system on the 5th floor in existing 5-story building in conjunction with dob job#m01337794. no change in use, egress and occupancy.
Mechanical work filed in conjunction with GC for lobby area renovation. Installation of new ductwork to serve the new lobby layout. No change in use, occupancy or egress.
Renovation of residential lobby. Minor demolition and carpentry. No change in use, occupancy or egress.
Interior renovation of apartments located on floors 9 to 11 and PH amenity space. No change in use, occupancy or egress.
Alteration of apartments on the 3rd-11th Floor of an existing 14 story multiple dwelling building. No change in use, occupancy or egress.
Mechanical work filed conjunction with renovation of retail space at 1st floor. No change in use, occupancy, or egress.
General construction to renovate apt 2a on the 2nd floor. work will include new partitions & finishes, new drop ceiling & flooring, and new plumbing fixtures. no change in use, egr…
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
MS application filed in conjunction with GC for renovation of 2nd floor commercial space. No change in use, occupancy or egress.
ALT-CO filed for a change of use to convert penthouse amenities into two new apartments and converting retail space into medical office. No change in bulk or egress.
Interior renovation of apartment 9. No change to occupancy, use or egress.