266 issued permits in New Dorp-Midland Beach, part of Staten Island, New York. Refreshed every 6 hours from the city's public permit feed.
266 permits
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 113 Grimsby Street. Subsequent fil…
New temporary construction arround property- g.c. application filed under dob now application # s01106980-i1
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 457 Lincoln Avenue. Subsequent fil…
HUB Consultation was accepted on 6/24/21 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 111 Grimsby Street. Subsequent fil…
HUB Consultation was accepted on 6/24/2021 for HPD Affordable Resilient Housing Program. Application filed herewith for installation of Curb Cut at 455 Lincoln Avenue.
Construction of new curb cut for HPD Affordable Resilient Modular Housing Project.
Installation of water piping, waste piping, gas piping, and plumbing fixtures for a two family dwelling
Install new HVAC units at the roof. No change in use, egress or occupancy under this application.
Legalize work without permit. remove cellar partition and legalize 2 fixture bathroom in cellar.
Application is filed for the plumbing work associated with the interior alteration application s00699120-i1. no change in use, egress or occupancy. all work as per plans submitted…
Resovle ecb violation: 39167488k, 39167489m and 39167490j; renovation of existing commercial store with general construction as per plan. egress or occupancy under this application…
Install 2 bathrooms, 2 washers and 2 dryers to address violation #039140973Y.