134 issued permits in St. George-New Brighton, part of Staten Island, New York. Refreshed every 6 hours from the city's public permit feed.
134 permits
No change in use, egress, or occupancy. Filing a post approval amendment for minor changes on plan set on Sheet PL-103.03. The only update was on the title sheet itself to indicate…
Filing of plans & paperwork for legalization of work completed without permit & assist with resolution of violations. removal of fixtures that cannot be legalized at attic level
Existing School Building R450, POT
Installation of 300 psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under t…
Installation of new plumbing fixtures and piping on all floors including new and replacement of hot water heaters and gas hot water heater.
exterior facade repairs, concrete patching, stucco repairs, pointing waterproofing.
Structural work being filed for the rehabilitation of the existing steel and concrete structure. No change to use, egress, or occupancy.
Heavy duty sidewalk shed during exterior facade repairs filed separately under application# s01056063. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occup…
installation of temp construction fence
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Proposed temporary construction fence located inside of the property line for the construction of a new detached two family residence.
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of solar panels on roof. no change in use, egress, or occupancy.