17 issued permits in Central Oakland, part of Pittsburgh, Pennsylvania. Refreshed every 6 hours from the city's public permit feed.
17 permits
Exterior and interior alterations, including replacing the south facade with new wood framed facade, new roof, windows and doors, interior walls, restroom, casework and finishes.
Use of (1) 12 sf and (1) 8 sf, illuminated wall signs facing forbes ave.
Alteration to the existing mechanical system to install a new split system and ductwork.
Existing (alteration/addition)
Minor alteration
Replacement of two gang meter socket with a new three gang meter socket. Addition of a small breaker panel to accommodate the “house” panel, which will supply common areas with pow…
Renovation and reconfiguration of existing build for change in use, including new accessible restroom and stage.
Gas line alterations, exhaust duct associated with new tankless hot water system.
New construction of an 11 story apartment building, site work, covered parking, accessory maintenance building and parking carousels.
Illimated individual letter sign (16'-4" x 3'-0") on 1st floor facade and illuminated individual sign (13'-8" x 2'-6") on 1st floor facade facing atwood st
Pli doesn't regulate work on state-owned property.
Interior alterations and exterior finish work as part of fitout of one story building with occupied basement as 1st floor dispensary with basement storage, office, and partial shel…