62 issued permits in Strip District, part of Pittsburgh, Pennsylvania. Refreshed every 6 hours from the city's public permit feed.
62 permits
New fire alarm devices for tenant fit out
Illuminated chanel letter sign (18'-0" x 1'-8")
New ductwork, diffusers, hydronic piping, and erv.
Power and lighting related to work performed under bda-2026-00030
Construct 2 subsurface detention tanks with managed release, tree planting and green roof for a new 5 story building.
New service, generator, transformers, panels, wiring, power, and lighting as part of construction of 6 story addition to existing museum
New ductwork, piping, doas, exhausts (including type ii exhaust connection for 1st floor commercial dishwasher), ahus, cooling tower, and diesel generator vents/exhausts as part of…
Construction of 6 story addition to existing museum including new theater, dining area, exhibition spaces, offices, restrooms, classrooms, bridal suite, storage, employee break are…
Removal of existing hvac/furnace equipment and installation of new hvac/furnace equipment
Add (1) vav box, atds, and associated ductwork in training room
Tenant fit-out including new storefront entrance, walls, restrooms, and finishes.
Installation of 1 rooftop hvac unit, ductwork within shaft to 1st flr for future connections, natural gas piping, and unit heaters for core/shell building - related to bda-2025-080…
Installation of electrical system, lighting & controls for initial office tenant space. work includes new feeders, panelboards, low-voltage transformer, hvac power, power devices,…
Interior non structural demolition
Fire alarm for common corridor between existing building lobbies including circuit wiring, occupant notification devices, and intiating devices.
Electrical system, lighting and power for tenant fit out on first floor and office and break room on the second floor
Installation of a multi-split ductless heat pump system with one outdoor unit and two indoor units
Illuminated channel letter sign (15'-8" x 2'-6") on front facade at first floor facing smallman street
Mechanical system for tenant fit out on first floor and office and break room on the second floor, with exterior equipment
Tenant fitout for office space includingf new partition walls, kitchenette, new fixtures and finishes.