11,537 permits · TX · Austin
Temporary power permit Ref 2026-011053 BP
Kitchen remodel windows replacement painting flooring replacement add gas add a AC vent replace sink location replace lighting on kitchen see plans.
Express- Replacing all drywall and electric (a family of raccoons ate interior wiring; need to pull all drywall out to determine full extent of damage).
Express: Foundation Repair- install 6 sonotubesreset/Reshim
Replacing two existing buildings I & K (via 2025-114723 PR) with one new modular building.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Vertical Heat Pump System
Construct new driveway approach of 11 FT. No sidewalk inspection per plan review.
Express: Foundation repair - install 7 push piers and 4 concentric piers
Replacement of an existing water heater swap out of tankless gas water heater with a similar model tankless water heater
Inground pool and spa
ePlan: Commercial Expedited Review- Interior Remodel and Change of Use to Create Mixed use Offices (18710 SF)
Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms and a half bathroom with kitchen and washer drain line. There will be a total of four access holes on the outside of the h...
New Construction of SFR in ETJ
Interior finish out for Mattress Firm in existing single story retail space. Scope includes electrical mechanical and plumbing.
ePlan: Commercial Expedited Review -Office Remodel. (19000 SF)
ePlan: Commercial Expedited Review - Office Remodel. (19000 SF)
ePlan: Commercial Expedited Review -- Office Remodel. (19000 SF)
Total demo of SFR 720 sq ft circa 1949 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition...
ePlan: Commercial Expedited Review - [APPROVED] Interior Remodel and Change of Use from Limited Warehouse and Distribution to Light Manufacturing Building (200000 SF).
Total demo of ADU 606 sq ft circa 1998 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition...