168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Interior non-structural wall, floor and ceiling finish removal and interior non-load bearing partition removal; and structural enhancement as per plans filed herewith. No change to…
Install costruction fence
Structural specifications filed in conjunction with gc application job #x00837908-i1.
Filing foundation drawings in conjunction with the GC application, job #X01250818-I1.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Scope of work includes but not limited to: legalization of existing bathroom, new walls and water closetrelocation. no change of use, occupancy or egress
Erect 8'0 high temporary construction fence as per plans submitted herewith.
Proposed structural repair for exterior walls to address ecb violation# 35685646l. no change in use, egress and occupancy
Herewith Filing Fifteen (15) Story New Building Building as per plans. Primary Use Group 3 - Non Profit w/ Sleeping Accommodations with Use Group 3 Daycare and Use Group 4 - Commun…
Filing for related plumbing work in conjuction with applicaton # x00934126 as per plans. no change in use, egres or occupancy.
Installation of suspended scaffold for facade work and/or inspection. Amend #1, change in outrigger detail and legend
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of suspended scaffold for facade work or inspection
provide new concrete pads for new Condensate return units and columns repairs as per plans.
Replacement of gas fired RTU with heat pump RTU and other mechanical work as per plans herewith. No change to use, egress, or occupancy.
Installation of a new mechanical system
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola