168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Re-pointing the brick joint at all around the building approximately=1650 sf
Heat/ air conditioning systems hvac on the roof with ducts work on the second floor no change to muse or occupancy.
Remove and install non bearing partitions. replace floor , wall and ceiling finish. install dryer vent, concrete pad and split type cooling / heating units.
Suspended Scaffold Installation for Facade Restoration and Inspection
Scope of work is solely for the installation of the solar electronic generating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc departm…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed temporary 8' high construction fence. no change to occupancy or egress
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Mpp-191: filing herewith installation of sprinkler system in conjunction with interior renovation of daycare space as per plans. no change in use, egress, or occupancy.
Installation of temporary fall protection @ elevator shaft as per plans in conjunction with nb construction. no change in use, egress or occupancy. temporary fall protection to com…
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Installation of solar panels, rooftop, grid tied, railed, 7 modules, 2.87 KW
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancythe sidewalk shed is at east 135th street and walnut avenue elevations.
X062_Provide Plumbing fixtures and associated piping for new ADA compliant Boys and Girls restroom. Provide ADA compliant drinking fountains and associated piping. Provide sump pum…
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applic…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Filing for Interior partition changes according to drawings for Units 1B, 1D, 1H, 1J, 1K, & 1L. No exterior work. No change egress.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Sprinkler and Standpipe work in conjunction with NB application # X01201390-I1