168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Re-pointing the brick joint at all around the building approximately=1650 sf
Construction fence
full demolition of one story structure, using mechanical means to assist
Foundation work as per plans filed.
Exterior upgrades and roof replacement of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fisp). no changes…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Rooftop solar installation. no change to use, occupancy or egress.
1. replace the ceiling with gypsum board and paint 2. remove the illegal bathroom and kitchen 3. remove violation no. 34113775h
Install construction fence
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Plumbing work in conjunction with Alteration 2 Application # X01332849-I1
Sprinkler work in conjunction with NB application #X01178301-I1
Install plumbing systems subsequent to GC (-I1) job.
Install temporary construction fence as per plans filed.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
This application is being filed for structural work at the subject premises for the repair of the underside interior of the ceiling slab at apts - 4a, 7a,7b, 7c, 7d, 7e, 7f, 7g, 7h…
Construction work to repair fire and water damage
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Temporary Construction Fence
Temporary walkway as per drawings. walkway shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Remove existing Vacuum pumps and install new Vacuum and condensate return unit with new zone control valve.