168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this app…
Exterior upgrades and roof replacement of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fisp). no changes…
Install temporary construction fence
Soe in conjunctin with construct of new three (3) story residential building as per plans filed.
Fisp inspection via industrial rope access
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replacement of 6 ton condensing unit on the roof. no change to egress, use, or occupancy.
Sprinkler specifications filed in conjunction with gc application x01271221-i1
Filling of construction wood fence 8 feet high around the property. no change in use or occupancy
1. replace the ceiling with gypsum board and paint 2. remove the illegal bathroom and kitchen 3. remove violation no. 34113775h
Foundation work as per plans filed.
Temporary Construction Fence
Remove existing Vacuum pumps and install new Vacuum and condensate return unit with new zone control valve.
Application filed herewith to propose partial demolition plans of 3 story building and attic
plumbing work at 1st floor to replace all work filed under Application #200712817 in order to withdraw out said application. No change in use egress or occupancy under this applica…
Full demolition to a three story house
(dev hub consultation completed for this application , please assign to dev hub) proposing new 7 story residential building.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Install plumbing systems subsequent to GC (-I1) job.
Rooftop solar installation. no change to use, occupancy or egress.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…