168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Suspended scaffolding for facade restoration
Scope of work includes but not limited to: legalization of existing bathroom, new walls andwater closet relocation. no change of use, occupancy or egress
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at bailey avenue, west 193rd street, and heath avenue elevations.
Construction fence for new building 210182256
Mechanical work in conjunction with NB application #X01178301-I1
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
General construction work to renovate the interior of apartment 1s & cellar. no change in use, egress or occupancy. filing to lift partial vacate order # 2252307 & swo 2252331 and…
Sidewalk shed proposed installation of sidewalk shed as per plan. no change in use,egress or occupancy.
Plumbing work for new 12 story building as shown on plans. Stormwater detention in the back of the building filed under X01166460-S7.
New storm drains, New trench drains, new stormwater detention and retention systems, new manholes, new water, sewer, and storm piping and associated valves.
Full demolition of a 2.5 story building. using hand held equipment and mechanical means to remove foundations, load out debris and back-fill.
Facade Repair
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Construction Fence filed in conjunction with NB# X00634188-I1, Demolition #220739627 and Demolition #220739636
Installation of temporary standpipe system for new 12 story residential construction.
Proposed new 1 story building store.
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at east 178th st, bryant avenue, e treamont avenue, and boston road e…
Renovate existing doctor's offices and nurses restrooms at 2nd floor including removing and installing new interior non-bearing partitions, plumbing, lighting and finish work ; no…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…