Ira facade inspection
Proposed new drainage work including synthetic turf system and sports equipment at PS 083X.
General construction work to renovate the interior of apartment 1s & cellar. no change in use, egress or occupancy. filing to lift partial vacate order # 2252307 & swo 2252331 and…
New storm drains, New trench drains, new stormwater detention and retention systems, new manholes, new water, sewer, and storm piping and associated valves.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Exterior masonry, roof, flood elimination, replace ramp at entrance
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Earthwork, Foundation, and structural work filed in conjunction with New Building, DOB Now application#: X00657118-I1
Landscaping and site improvement including minor earthwork and non-structural concrete as per plans. no change in use, egress, or occupancy.
X015_Repair hardwood floor. Paint standard game lines and school logo on floor. Paint exposed CMU walls and steel columns. Provide new scoreboard and cage, wall padding, ADA exit d…
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Removing existing oil tank & oil boiler as per plans. removed components to be replaced with two (2) new gas fired boilers. also installing one (1) new hot water heater & one (1) n…
Installation of pv system on existing rooftop. no changes to egress or use of occupancy.
Installation of solar panels, rooftop, grid tied, railed, 15 modules, 6.6 KW
Installation of 300 psf sidewalk shed and overhead protction as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under…
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Filing herewith plumbing and sprinkler work as per plans submitted.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at east 178th st, bryant avenue, e treamont avenue, and boston road e…
Plumbing Work Type filed in conjunction with NB # X00685698