Filing Sprinkler application subsequent to primary job number X01238545-I1.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Facade repair
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Filing for sub-slab depressurization system as per plans filed herewith. no change in egress, use or occupancy.
Facade repair as shown on plans, to address ecb violation # 39164485l.
Facade Repair
New storm drains, New trench drains, new stormwater detention and retention systems, new manholes, new water, sewer, and storm piping and associated valves.
Scope of work includes but not limited to: legalization of existing bathroom, new walls andwater closet relocation. no change of use, occupancy or egress
Exterior masonry, roof, flood elimination, replace ramp at entrance
General construction work to renovate the interior of apartment 1s & cellar. no change in use, egress or occupancy. filing to lift partial vacate order # 2252307 & swo 2252331 and…
Renovate existing doctor's offices and nurses restrooms at 2nd floor including removing and installing new interior non-bearing partitions, plumbing, lighting and finish work ; no…
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Facade repairs as shown on plans.
To make balcony with railing on existing first floor roof deck slab.
Proposed new 1 story building store.
Installation of temporary standpipe system for new 12 story residential construction.
Construction fence for new building 210182256