168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New Dormitory
Remove existing 5000 gallon tank and replace with two 275 gallon oil tanks.
Sbh detox suite - 4422 third avenue - general construction including modifications to existing ceilings, floors, partitions and doors as per plans filed herewith. no change in use,…
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code. no change in use, egress or occupancy under this app…
Plumbing application filed in-conjunction with NB application.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Facade repair, parapet wall replacement as per plan. there will be no change in the use, egress, or occupancy under this application.
Filing to install Pizzeria Kitchen hood and ductwork as per plans. No change in use, egress or occupancy.
Roof replacement. no change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Landscaping and site improvement including minor earthwork and non-structural concrete as per plans. no change in use, egress, or occupancy.
Installation of construction plywood fence to enclose site during ramp construction, for public safety.
Repair Parapet Cornice as per proposed plans and as per stated on violation no. V 020226CPI20401SB.
Provide cold water piping and double check valve assembly for drinking foundation outside of building.
Installation of the new steel beam to re-support bulkhead roof. installation of steel posts to support door. installation of new and angle to support curb.
Replace roof drains with associated piping as required for roof replacement work. Relocate vent stacks on building roof.
Foundation work in conjunction with NB #00917240
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code. no change in use, egress or occupancy under this app…
Installation of: 1). new exterior drinking fountain and associate piping, sump, etc and 2). new storm drainage piping and structures, including new drain below stair lift. no chang…
Propose removal of gas boilers, Water Heater, H.W storage tank and associated piping and install new boilers, heat pumps, IWH, and ET as per plan, filed in conjunction with GC # X0…
Installation of constructon fence