New mechanical ductwork and installation of new air conditioning units.
Install new gas piping and new gas meter as per plans. no change in use, occupancy, or egress.
Replacement of existing plumbing fixtures throughout apartment 6A.
Temporary standpipe addition for new building over 75 feet high
Removal and replacement of the existing steam supplied hot water generation to a direct natural gas fired water heating system. no change to use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replacement of lluminated double-sided header pylon sign filed under job# x00004400 - in property lines - bruckner commons. no change of use, egress or occupancy.
Proposed plumbing and gas works scope for boilers and hot waters replacement, new roof drains, and miscellaneous plumbing piping works on each floor as shown on plans. There will b…
New automatic wet spronkler and standpipe systems installed in new building
Installation of one new gas fire hot water boiler
interior renovation of existing store into nail salon(UG6). No change in use, egress & occupancy.
Removal of mini building and TR2 & TR3 concrete precast inspection on the I1 for the S1 catch . See initial application for all concrete.
Installation of construction fence in conjunction with
Installation of 8 construction Fence.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Herewith filing for replacement of plumbing fixtures and piping. paa submission to remove gas scope of work from application, no work required on gas systems.
support of excavation in rock using rock cutting (with rock pins, as needed), soil berming and rock removal
Hub: accepted 9/5. filing herewith construction of new 9 story building as per plans.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Facade restoration and leak repairs as per plans. no change in use, egress or occupancy.