168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed new 12 story 80 unit residential building.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Foundation earthwork field in conjunction with new building application #210179625
Use of Placing Boom for building construction. This application is filed in conjunction with NB X00871979-I1
Full demolition to a one story garage
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replacement of boilers and associated controls, combustion air, and flue.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Hub: accepted 9/5. filing herewith construction of new 9 story building as per plans.
Interior renovation of existing supermarket. work includes storefront & partition modifications, new finishes, ceilings, lighting, plumbing fixtures, and equipment as per plans. no…
Facade restoration and leak repairs as per plans. no change in use, egress or occupancy.
Herewith filing for replacement of plumbing fixtures and piping. paa submission to remove gas scope of work from application, no work required on gas systems.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
installation of solar panels, rooftop, railed, grid-tied, 30 modules, 12.3 kw
Installation of solar panels, rooftop, railed, grid-tied, 2 modules, 0.87kw
This Application is filed in conjunction with ALt-1 application X01344647-I1 for plumbing related work after building fire, no change of use, egress or occupancy
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Installation of one new gas fired hot water boiler