168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc…
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Soil remediation work as per plans filed. No change in use egress or occupancy.
Interior renovation in existing two family house. all walls to be plastered, compound and paint in the first & second floor. no change in use, occupancy or means of egress.
Installation of outrigger for facade repair.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replace ceiling,wall tile and paint. replace existing exterior finish with stucco, (1) existing door with auto sliding door.
New Sprinkler heads installation and existing sprinkler heads modification to existing sprinkler system for I-4 daycare use, ages 0-13, 58 children and 19 adults. No change in use,…
(MPP project Project-000000540 - please assign to dev hub) PROPOSED 5 STORY RESIDENTIAL BUILDING
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
FILING TO INSTALL OUTRIGGER ON THE ROOF FOR FACADE WORK. No change in use, occupancy or egress under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under th…
Installation of temporary needle beam as per plans. no change in use, egress or occupancy.
Installation of temporary pipe & system scaffold as per plans. no change in use, egress or occupancy.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc…
Alterations to plumbing system throughout
Structural specifications filed in conjunction with nb application #x01273665-s7
Full demolition to a three story house
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc…
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc…