Material hoist. for materials only. no work from hoist.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the nyc building code 2022. no change in use, occupancy, or egress under this appl…
Installation of solar panels, rooftop, grid tied, railed, 5 modules, 2.175 KW
Installation of fence.
Install hot water heater, storage tank, new washers, dryers and plumbing fixtures for new commercial laundry
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Replacing existing spray showers within existing exterior playground area with associated catch basin and trench drain.
CMU repair at Stairs 1 and 2 at the cellar level and ground floor.
A separate structural application being filed for damaged roof due to fire / water that occurred on november 28, 2025. no change in egress, use or occupancy.
Material hoist. for material only. no work from hoist.
Facade restoration as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this applica…
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf. shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.
Application filed herewith to legalize the demolition of an existing structure
Remove ductwork, grills & registers in office area being removed
Install chimney liner in existing masonry chimney
Remove and replace existing parapets. remove and replace tank roomexterior walls, remove and replace existing exterior brick
Installation of suspended scaffold for facade work and/or inspection. Amend #1, change in outrigger detail and legend
FISP INSPECTION (Facade Inspec/on Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola