168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Proposed 9 story multiple dwelling building.
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
Install new 8' construction fence for nb construction
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Structural Filing in conjunction with GC filing # X01097777-I1
Foundation and earthwork specifications filed in conjuntion with gc application job # x01273997-i1
Construction of a 13 story residential building.
Sewer sleeve inspection only for newly installed 6 extra heavy cast iron combined sewer service.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Full demolition to a two story house
repair existing steel lintel over existing overhead garage door. No change in use egress or occupancy
Install a new three fixture bathroom at cellar 1st floor and 2nd floor.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Interior renovation in existing commercial store. no change in use, means of egress or occupancy in this application
Filing to legalize the full demolition of the building and foundation
Installation of new sidewalk shed at 2801 schley avenue, bronx, ny 10465 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of mechanical units on roof with ductwork as per plans herewith.
Foundation applicaiton filed in conjunction with the nb application
Remove and replace partitions, casework, cabinets, window shades, furniture and equipment, flooring, and finishes. plaster patch and paint walls and ceilings, interior lighting.