6,470 permits · NY · Bronx
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Replacement of existing ventilating fans, ductwork and cotnrols
Sp/sd work in conjunction with the nb application filed for 19 story r2 supportive housing. project name - west tower. fee deferral letter is under supporting documents.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Moderate renovation of existing residential building. interior renovation with limited exterior work as noted.
Plumbing specifications filed in conjunction with gc application x01208498-i1
Limited to repair of existing exterior facade elements, such as mortar joint repointing, out wythe brick replacement, patching and crack repair of stone ornamentation, stone joint repair, stucco repai...
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Filing Structural Application subsequent to primary job number X01197603-I1.
Provide new wall mounted lavatory & associated plumbing piping. Provide new drinking fountain & associated plumbing piping. Provide new wall mounted water closet & associated plumbing piping. Provide...
Modification of an existing Boys' Toilet Room and Girls' Toilet Room to make ADA compliant. The scope of work includes the removal of (1) urinal.
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
Temporary sd in conjunction with the nb application filed for 19 story r2 supportive housing. project name - west tower. fee deferral letter is under supporting documents.
Facade Restoration & Inspection
Sp/sd work in conjunction with the nb application filed for 19 story r2 supportive housing. project name - west tower. fee deferral letter is under supporting documents.
Filing for temporary shed.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of pipe scaffold for ps 152x at 1007 evergreen avenue, bronx as indicated on plans. there will be no change in the use, egress, or occupancy under this application.