168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Application filed to erect a 3 story single dwelling building. Please assign same examiner to 3111, 3113, 3115, 3117, 3119, 3121 and 3123 Henry Hudson Parkway West. X01173147-I1, X…
Renovation of an existing apartment building. Water/sanitary piping, gas piping, gas fixtures, and bath/kitchen fixtures are to be replaced No change of use, egress, or occupancy u…
Installation of a temporarily supported scaffold and site specific engineered enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use,…
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
Application filed to erect a 3 story single dwelling building. Please assign same examiner to 3111, 3113, 3115, 3117, 3119, 3121 and 3123 Henry Hudson Parkway West. X01173147-I1, X…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Provide new plumbing system throughout new two stories residential building, in conjunction with nb job #x01077513.no change in use, means of egress or occupancy in this applicatio…
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applic…
Installation of overhead protection and shoring as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this applicat…
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Facade restoration at Forest House Building # 08 to comply with LL 11/98, cycle 10 report. No change in use, egress and / or occupancy.
Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occup…
8' high solid fence around property perimeter.
Limited to repair of existing exterior facade elements, such as mortar joint repointing, out wythe brick replacement, patching and crack repair of stone ornamentation, stone joint…
Replacement of existing ventilating fans, ductwork and cotnrols. replacement of existing window ac unit
Proposed interior renovation converting existing four-story and basement commercial building into a 40 unit residential buildng
Filing herewith installation of underground/onsite plumbing including installation of on site inlet conveyanance piping and underground retention systems.
Remove, replace or install plumbing fixtures in conjunction with GC application #X01350139-I1.
Removal and replace partitions, wall base, doors and door hardware, finishes, built in shelving, ceiling & soffit, radiator enclosure, window shade, fixtures and finishes.
This job is filed for minor 2nd floor framing- repair work after some fire damage conjunction with Alt-2 application # X0132865-I1, no change of use, egress of occupancy