168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
provide new concrete pads for new Condensate return units and columns repairs as required
Install construction fence as per plan. fence filed for +/- 200 linear feet.no change in use, occupancy & egress.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Proposed 71 units. 10 story residential building.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Outrigger for facade repair.
Proposed installation of pipe scaffold for new building as per plans. no change in use occupancy or egress under this application.
Parapet replacement work as per plans. no change in use, egress or occupancy. work shall comply with chapter 33 of the 2022 nyc building code.
Installation of suspended scaffold for facade work or inspection.
Installation of new gas meter for new gas hot water heaters and newgas piping to it, new gas hot water heaters filed under subsequentapplication job #x01349026-s1.
Propose new 10-story building consisting of residential ug#2) and non-profit institution with and without sleeping accomodations (ug#3 & ug#4). obtain new c of o.
Mechanical work related to nb# 240292349
Facade repairs as per drawings. there is no change to use, egress, or occupancy
Facade restoration project. No change in use, egress or occupancy.
Install new gas service, meter and piping.
Plumbing work filed in conjunction with NB Application #X01047537.
Alteration proposed to convert existing two-family building with accessory garage into three-family with accessory one-car garage; no enlargement or changes to egress, amend certif…
Erect Temporary construction fence
Alteration to existing single family dwelling at north side of structure. horizontal enlargement. new cellar bilco hatch and ac unit pad. interior changes as per plans.