6,318 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# X00616474 .
Installation of plumbing and sprinkler system for a transfer station in conjunction with x01164528-i1.
Install new distribution ductwork existing air handler and condenser to remain (package unit) No change to use , bulk or egress
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Mechanical equipment use for partial demo (bobcat s250 skid-steer loader, hyundai r210lc-9 hydraulic excavator, brokk 110 hydraulic breaker, jlg 650 boom lift (or equivalent approv…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Connect gas line to new havc, no change to use occupancy or egress.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Modification of an existing Verizon site. Replace natural gas service from basement gas meter to generator replacement on roof filed under DOB application no. X00802727-I1. All wor…
Structural specifications filed in conjunction with gc application #x01097144-i1.
Suspended scaffold outrigger system at 1400 pelham parkway south, bronx for facade restoration work with inspections. there will be no change in the use, egress, or occupancy under…
Restore garage doors to prior existng legal conditions
New Building - Waste Transfer and Recycling Station
Installation of new sprinkler system at laundry room. no change to use, egress or occupancy.
Jacobi Medical Center proposed Electrical Lighting work interior renovation of an MRI on ground, 3rd and 4th Floor. No change in use, egress or occupancy. All as per plans filed he…
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Sprinkler, plumbing, and standpipe scope of work in conjunction with new building.
New 4 story building-community facility,offices,ambulatory diagnostic or treatment health care facilities