6,318 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing. No change in use, egress…
Proposed mechanical work including but not limited to relocation of existing air handling units and new duct work for new tenant banana republic. no change to use, egress, or occup…
Installation of plumbing and sprinkler system for a transfer station in conjunction with x01164528-i1.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of plumbing and sprinkler system for a transfer station in conjunction with x01164528-i1.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
8904-MH Disconnecting 2 existing RTUs and replacing units for future tenant as per plan. No new gas piping all work done after Gas shutoff valve. No change in egress use group or o…
Install new distribution ductwork existing air handler and condenser to remain (package unit) No change to use , bulk or egress
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Connect gas line to new havc, no change to use occupancy or egress.
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022…
Fire protection scope of work in conjunction with new building x00493694-i1.
The scope of the structural work is strictly repair and maintenance from normal wear and tear. the structural design work does not constitute a change of use or addition to the exi…
The scope of the structural work is strictly repair and maintenance from normal wear and tear. the structural design work does not constitute a change of use or addition to the exi…
New 12'-0 wide Curb cut on Sedgwick Avenue. Filed in conjunction with NB X01080947-I1
Installation of plumbing and sprinkler system for a transfer station in conjunction with x01164528-i1.
temp construction fence 8' high at lot lines
Installation of new sprinkler system at laundry room. no change to use, egress or occupancy.