168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Install a new sump pump and replace a section of associated piping with new.
Construction fence filed for the construction of a new building.
Herewith filing six (6) story building as per plans primary use group 3 - non profit w/ sleeping accommodations and use group 4 - community facility.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
8' high solid fence around property perimeter in conjunction with nb #x01130512.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of solar panels, rooftop, grid tied, railed, 33 modules, 13.53 KW
Filing herewith vertical/horizontal enlargement to existing 1 family dwelling and convert to 2 family dwelling.
Soe work in conjunction with nb application x01310666-i1
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Proposed 3-story masonry building with cellar, two family dwelling.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of a new mechanical system for a new 3 story building in conjuction with job application #240291019
Sprinkler work filed for new building.
Installation of a temporary construction fence., Filed in conjunction with ALT I app# X01301537-I1
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
New Building Erect one story masonry warehouse
Temporary air pressurized standpipe for new building as shown on drawings filed herewith,
Interior renovation of mechanical ductwork throughout. No changes in use, egress, or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Alt-co filed to relocate the laundry room from the cellar to the 1st floor; convert 1st floor existing perambulator room to a new laundry room, mailroom, recyclying room and packag…