168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of 40.875 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Replace high pressure steam boiler.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
This project will include remodeling of the kitchen, a bathroom, a portion of the living room on the first floor, and some aesthetic improvements to the stairs.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of temporary sidewalk shed and pipe scaffold as per plans. sidewalk shed and pipe scaffold shall comply with chapter 33 of the 2022 nyc building code. no change in use…
Proposed super structure work filing #b01266301-s7 in conjunction with g/c filing #b01266301-i1
Installation of non-load bearing partitions and related finishes for health clinic fit-out. No changes in use, egress or occupancy.
Alteration being filed for minor interior work and to restore the garage to it's prior condition to resolve ECB violations. No change to use, egress or occupancy.
Installation of New HVAC and Ventilation equipment for an existing Two family house. No change of sue, egress or occupancy under this application
Exterior facade repairs and waterproofing. No change in use, egress or occupancy. Sidewalk shed filed under separate application
Installation of 300 psf sidewalk shed and overhead protection as per plans. all equipment shall comply with chapter #33 of the 2014 code. no change in use, egress or occupancy unde…
Application filed for interior renovatiosn and horizontal extension to first floor of existing two story mixed use building. converting first floor to community facility-synagogue.…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
NYCHA Woodson Bldg#02, exterior repairs as per the plans filed, including: removal/ replacement/ repairs to roofing system, bulkhead door, masonry, concrete and roof drains. Instal…
Installation of 8 ft construction fence.
Proposed to replace existing fixtures and add a shower in existing bathroom, no change in occupancy, use and egress under this application
Proposed interior renovation, window replacement and deck at rear yard of existing two-family building; no changes to use,occupancy and/or egress.
Structural work filed in conjunction with horizontal rear enlargement to ex 1 family building at basement & 1st floor. install new cmu walls & steel framing per plans. install new…
Application filed herewiht to convert an existing three-story community facility building into a twenty seven (27) family residential building