168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Modification of interior framing and enlargement of rear wall window opening.
Propose renovation for existing residential building with partition work & finish work, rebuild front porch & the terrace, the new deck in the rear as per plan. No change in use, e…
General construction and structural modifications as per plans filed herewith. No change to use, occupancy, or egress. Scope limited to below ground only
General construction and structural modifications as per plans filed herewith. No change to use, occupancy, or egress. Scope limited to below ground only
Gas connection to replacement boiler.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Herewith filing for damage wall repairs per plans. there is no change in occupancy use or egress.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress under this application, all work to comply with chapter 33 of nycbc.
full demolition of Two-story structure using hand-held and mechanical to assist.
Proposed installation of pipe scaffold for remedial repairs as per plans. pipe scaffold shall comply with chapter#33 of 2014 the ny building code. no change in use occupancy or egr…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Knuckleboom placement. this application involves no change in use, occupancy or egress.
Sprinkler/Standpipe Systems filed in conjunction with NB B01097108-I1
Mechanical worktype hereby filed for daycare fit-out space at the basement, 1st and 2nd floor, filed in conjunction with the NB application: 321244809.
Combination of existing apartments 3h and 3g, to comply wth tppn 03/97. renovation to include minor removal and installation of non load-bearing interior partitions, stairs and fin…
NYCHA Woodson Bldg#02, exterior repairs as per the plans filed, including: removal/ replacement/ repairs to roofing system, bulkhead door, masonry, concrete and roof drains. Instal…
New temporary construction fence around vacant lot. no change in use, egress or occupancy.
Demo detached garage. On-site and off-site fill not to exceed 300 cubic yards.
Shp2 - filing for civil site work in conjunction with new building b00848002-i1
Filing for change in building occupancy from factory building to business and low hazard storage as per plans filed herewith.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…