168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Structural work as per plans filed herewith. no change to use, egress or occupancy.
Proposed new building for 4-story w/ cellar and penthouse, 12 residential apartments building.
Facade application at exposure 1. filing to remove existing brownstone face and trim and install brick veneer to existing backing. filing to remove existing brownstone stairs and r…
Installation of sidewalk shed
Plumbing modifications to take place on the first through third floor as per drawings filed herewith. No change in use, egress, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Facade restoration as indicated on drawings. there will be no change in the use, egress or occupancy under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Provide new fire sprinkler system throughout four-story residential building with cellar in conjunction with alt co#b01109577-i1.
Mechanical modifications taking place on the cellar, first and roof. no change in use, egress or occupancy.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
application filed in conjunction with BIS job # 340351924
Domestic water, sanitary waste, and sanitary vent piping distrubution to support the proposed lavatory. demolition of existing lavatory.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Plumbing work is filed to conjunct with general renovation . no change in use, egress and occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
relocation of existing condensers
K656, installation of a temporary mobile boiler and a6000 gallon tank in conjunction with dob # . no change in use, egress, or occupancy.
Application filed herewith to convert an existing 3 story 2 family building into a ten family
Installation of solar system on the roof as per plan. No change in use, egress or occupancy