168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New curbcut installation.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of a temporary 8' high construction fence within the lot and aligned on the lot line, in open space.
Structural work as per plans filed herewith. no change to use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
K656, installation of a temporary mobile boiler and a6000 gallon tank in conjunction with dob # . no change in use, egress, or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Application filed herewith to convert an existing 3 story 2 family building into a ten family
Filing Plumbing application subsequent to primary job number B01286498-I1
Provide new fire sprinkler system throughout four-story residential building with cellar in conjunction with alt co#b01109577-i1.
Facade restoration as indicated on drawings. there will be no change in the use, egress or occupancy under this application.
Installation of solar panels, rooftop, grid tied, railed, 5 modules, 2.05 KW
Replace plumbing fixtures in bathrooms and kitchen to resolve ECB violation number 39151478K. No change to use, egress or occupancy.
Renovation of existing cellar, 2nd and 3rd floor with plumbing work:relocate&replace kitchen and bathroom fixtures; new combi. boiler on 2nd and 3rd floor; new 2-pc restroom, washe…
Existing two-family dwelling to be renovated. removal of partitions, installation of partitions. install new wall and floor finished and rear enlargement with rear deck. amended ce…
relocation of existing condensers
Installation of solar electric generation system for utility interconnection. No changes being made to use, occupancy, egress, or anything not marked on the planset and supporting…
Proposed temporary construction fence 8' high in conjunction with alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Vertical and horizontal enlargement of existing 2 story commercial building