168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed replacement of existing wood beam in the basement with new structural steel beam and concrete footing. No change in building use, egress, or occupancy.
Construction fence as per drawings during nb const, filed sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applicati…
Mechanical plans filed herewith in conjunction with dob now application b00976213.
GC scope incl. roof replacement, exterior masonry & precast cladding repairs, interior cosmetic repairs. Earthwork scope incl. slab trenching & minor exterior excavation to accommo…
Shl2 - filing for civil site work in conjunction with new building b00848066-i1
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Early foundations below grade plumbing for the erection of a 33,551.88 sf single story new building for use by con edison as an electric utility substation - use group iv(b)
Mechanical specifications filed in conjunction with gc application b01239985-i1
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Erect illuminated accessory business wall sign reading av with stripes
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Structural, filed in conjunction to alt. co application job # b00976213-i1.
Create new opening at the side of existing residence, all as shown on drawings herewith submitted.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Proposed multi-story mixed-use building total of 99 dwelling units & general retail
Filing Sprinkler plans in conjunction with new building B00614751-I1.
Multipoint Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
Demolish two existing electric, centrifugal chillers. provide new 6-pipe water-to-water heat pumps. replace 3 existing chilled water pumps. no change in use, egress or occupancy.
Modification of mechanical systems and associated ductwork.