168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
General construction to allow for new hot water & heating equipment in the mer at cellar per plans filed herewith. restoration of existing finishes. no change to use, egress, or oc…
Nycha boiler general construction in the cellar as per plans filed herewith. no change in use, egress, or occupancy.
Nycha boiler general construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Minor exterior repair including brick replacement, minor concrete patching, minor stone patching among other work included in plans attached herewith. no change to use, egress or o…
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #22) as per the plans filed herewith.
Replacement of existing hvac roof top unit on existing steel dunnage & reconnect to existing duct work. kitchen exhaust ventilation system (hood, duct & fan.) for popeye's restaura…
Filing sprinkler & standpipe in conjunction with nb app # 321923549
Proposed temporary construction fence in osp
Plumbing installation with the renovation of an existing 2-family residential townhouse. work on floors basement, 001, & 002. plans filed herewith. no change to use, occupancy, or…
Filing plumbing underground site connection work type.
Filing for Plumbing work for the installation of plumbing fixtures in Apt 3G on 3rd Floor. No change to Use, Egress or Occupancy.
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Resolve dob violation: vw 082101c07a04; remove illegal partitions wall,doors and restore back to prior legal condition at cellar; no change in use, egress or occupancy under this a…
Install new awning with canvas cover at storefront reading we two nail spa as per plan. no change in use, egress, and occupancy.
Fn/ps194k for temporary construction equipment(emergency fence) submitting on behalf of contractor, in conjunction with llw# 126670 no change in use, occupancy or egress
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #21) as per the plans filed herewith.
Interior renovation included demolition work as shown on plans filed herewith.
Provide all plumbing system for the new food shop within the existing building shell, including water, sanitary, grease sanitary and connect them to the existing utilities. provide…