168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Renovation of 2 family residence, minor partition work, window replacement, renovation of kitchen and bathroom at 1st and 2nd floor owner duplex, new rear deck and stair to yard. N…
Installation of engineered enclosure system as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application…
Pl and sp work as per plan, no change in use, means of egress or occupancy
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #22) as per the plans filed herewith.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Structural work associated with coffee house fit out
Proposed temporary construction fence in osp
Nycha boiler general construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
K059 : Repair of the Reinforced Concrete Beam under the Stairs. Repair of the Parapet walls as shown on the Plans filed herewith.
Renovation of the the 1st floor of an existing 2 family building. No change of use, egress or occupancy under this application.
Minor exterior repair including brick replacement, minor concrete patching, minor stone patching among other work included in plans attached herewith. no change to use, egress or o…
Replacement of existing hvac roof top unit on existing steel dunnage & reconnect to existing duct work. kitchen exhaust ventilation system (hood, duct & fan.) for popeye's restaura…
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Plumbing installation with the renovation of an existing 2-family residential townhouse. work on floors basement, 001, & 002. plans filed herewith. no change to use, occupancy, or…
Remove interior non-load bearing partition and door to restore to prior legal condition on 3rd floor. remove ecb violation # 35679568y, 35580724r, 35462215l and vacate order # 3739…
Interior renovation included demolition work as shown on plans filed herewith.
General construction to allow for new hot water & heating equipment in the mer at cellar per plans filed herewith. restoration of existing finishes. no change to use, egress, or oc…
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #19) as per the plans filed herewith.
Filing plumbing underground site connection work type.