168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
new building application to construction 3 story 1 family house.
File plumbing work in proposed store with installation of new plumbing fixtures as per plan. no change in use, egress or occupancy.
Plumbing work in conjunction with tenant-fit out office suites on 10th floor
(Please assign to the dev hub to the same examiner as job #B01297622-I1 as it's one zoning lot with the same owner and applicant) PROPOSED NEW SEVEN STORY MIXED USE BUILDING
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of solar panels on exisitng roof. no change in use, occupancy, or egress. no change in bulk
Structural work associated with coffee house fit out
Alteration to ground retail space. removal of entry access stair, addition of ada lift at entry, modification of existing stair to add compliant handrails, removal of ext raised wo…
Resolve dob violation: vw 082101c07a04; remove illegal partitions wall,doors and restore back to prior legal condition at cellar; no change in use, egress or occupancy under this a…
Repairing apt #2d in existing multiple dwelling. repair plaster damage as needed, restore firestopping as needed, install new sheetrock & new flooring throughout as needed. no othe…
Renovation of 2 family residence, minor partition work, window replacement, renovation of kitchen and bathroom at 1st and 2nd floor owner duplex, new rear deck and stair to yard. N…
Propose structural work for a renovation of existing 2-story with cellar, masonry building with horizontal and vertical rear extension, filed in conjunction with GC # B01251681-I1.
Reinforcement for new stair in existing retail space
To remove illegal kitchen and 3-pc bathroom on cellar; renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 3-pc bathroo…
Pl and sp work as per plan, no change in use, means of egress or occupancy
Renovation of existing 1-family. removal and installation of plumbing fixtures. no change of use, egress or occupany under this application
Sprinkler works as per plans filed herewith.
Removal of plumbing fixtures as per plans. no change in use, egress or occupancy.
Install plumbing fixtures and sprinkler system in conjunction with b01345302-i1.
Installation of engineered enclosure system as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application…