168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Renovation of existing single-family residence including demolition & construction of interior non-structural partitions, replacement of windows at rear, replace existing cellar st…
Mechanical work as per plans. no change of use, egress or occupancy under this application.
Plumbing in conjuction with Architectural # B01224098-I1
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #8) as per the plans filed herewith.
Nycha boiler general construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Plumbing work as per plans filed herewith. no change to use, egress or occupancy.
Mechanical work for central boiler plant and domestic hot water system replacement (van dyke bldg #13) as per the plans filed herewith.
Filing to do minor renovations throughout existing restaurant space
Side alley vault repairs as shown on plans
Facade repairs. No change in egress, use or occupancy.
Installation of new plumbing fixtures for cold and hot water, sanitary drainage, sanitary vent piping installation of new storm drainage system. install fire sprinkler system in th…
Inter. renov.: removal of gwb, flr, clg & wall finishes & light fixt. installat'n of new gwb, floor, clg & wall finishes. installat'n of replacement light fixt. no change to use,eg…
Sf/is234k - for temporary construction equipment(scaffold) submitting on behalf of contractor, related to dob# b01114935 no change in use, occupancy or egress
Bathroom renovation, floor replacement and doors replacement in apt. #5c. no change of use, egress or occupancy
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Installation of sidewalk shed for public protection during construction work
Propose new illuminated channel letters on stucco wall for existing commercial space. no change to use, egress or occupancy.
Existing interior demolition & restoration due to fire damage of 1st, 2nd floor. illegalrear extension to be demolished andrestored to previous design.2.no change in use, means of…