16,373 permits · NY · Brooklyn
Application filed for removal and new installtion of plumbing fixtures filed inconjunction with horizontal and vertical enlargement b00979960-i1
Installation of solar pv system. no change to use, egress, or occupancy.
Structural filing for poured in place concrete structure as per plans
Full demolition to a four story building
Interior renovation of existing 1st floor and 2nd floor areas. no change in use, occupancy, or egress.
Reframing of existing roof and interior renovation in conjunction with alt 1 322033615 .
Installation of pipe scaffolding, and roof protection as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Renovation of exist commercial space on the 1st&2nd floor: replace minor kitchen appliance.install new partitions, floor/wall/ceiling finishes. new hvac unit and duct works.install new area ef& mua. r...
Application herewith filed for the interior renovations of 1st floor unit of existing 2 family residence. No change to use, egress or occupancy.
Plumbing work associated with conversion of existing 2 family to 1 family residence with associated interior renovations & enlargement. In conjunction with the Alt CO app#B01088271-I1. There is no cha...
Installation of plumbing fixtures and related piping as shown on drawings. no change to occupancy use or egress.
Plumbing work associated with the renovation of apartments 1, 2, 3 & 4.
Installation of 8 ft construction fence.
Proposed plumbing work on cellar in conjunction with application b01320107-i1 to address violation39165961h, 39165960x. no change in use, egress or occupancy.
Propose to modify sprinkler system as per plans filed herewith. No change in use egress or ocupancy is proposed under this application.
Subsequent structural filing in conjunction with gc #b01255682-i1
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Interior renovation (ALT-2) of 5th Floor, including four adjacent apartment units (C511, C512, C513, C514). No change in use, occupancy, or egress.
Installation of 8 ft construction fence.
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...