16,373 permits · NY · Brooklyn
Installation of temporary shoring as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Filing for repairs to the facades. No change to use, occupancy or egress.
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Replace gas-fired boiler with boiler and gas/oil burner. install (2) new 330 gallon fuel storage tanks as per plans. filed in conjunction with b01357162-i1-la. no change in use, occupancy, or egress.
Interior renovation of existing 1st floor and 2nd floor areas. no change in use, occupancy, or egress.
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Install new chimney liner as per plans. no change in use, occupancy, or egress.
Interior renovation of existing commercial space (use group 6) to be used as eating and drinking establishment. (same use group) install new kitchen and bar plumbing and cooking equipmentas per plans.
Interior renovation of existing two story with basement house. no change in use, occupancy or egress
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Suite 1208 & 1218: Interior renovations as per plans filed herewith. No change to use, egress or occupancy
Installation of plumbing fixtures and related piping as shown on drawings. no change to occupancy use or egress.
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application,
Proposed temporary construction fence at open space, install fence extending beyond 8 feet of the front property line and along the rear yard property line. as pre plan. in conjunction with gc job#: b...
Subsequent fence application in conjunction with apprroved gc #b01255682-i1
Replacement of one gas fired boiler in cellar.
Full Demolition of Existing one story Building
Plumbing work associated with conversion of existing 2 family to 1 family residence with associated interior renovations & enlargement. In conjunction with the Alt CO app#B01088271-I1. There is no cha...