16,373 permits · NY · Brooklyn
Installation of material hoist on the roof. installation shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
The application is for the renovation of the roof located at 271 union street. the proposal includes new dunnage and chimney removal.
Installation of pipe scaffolding, and roof protection as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Filing for Exterior Campus Perimeter fencing and Campus walkway fencing, Playground & sports court Renovation. No change to Use, Egress or Occupancy.
Proposed plumbing work on cellar in conjunction with application b01320107-i1 to address violation39165961h, 39165960x. no change in use, egress or occupancy.
Reframing of existing roof and interior renovation in conjunction with alt 1 322033615 .
Installation of solar pv system. no change to use, egress, or occupancy.
Interior renovation existing 2 story building. work in cellar, 1st and 2nd floor. demolition work and construction work as per plan. install and repair partition, flooring, ceiling and painting throug...
Install new boiler, h.w.h.,bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Installation of solar pv system. no change to use, egress, or occupancy.
Filing sprinkler work type in conjunction to b01179137-i1
Provide HVAC upgrade for apartment fitout including four heat pump system.
Plumbing work filed with renovation to existing apt# phe. install plumbing fixtures and piping. no change to use, egress or occupancy. gen construction filed under b01169308-i1.
Proposed temporary construction fence at open space, install fence extending beyond 8 feet of the front property line and along the rear yard property line. as pre plan. in conjunction with gc job#: b...
Plumbing work associated with the renovation of apartments 1, 2, 3 & 4.
Interior renovation of existing 1st floor and 2nd floor areas. no change in use, occupancy, or egress.
Interior renovation of existing 4 family 4 story & cellar building. no change of use, egress or occupancy.
Installation of suspended scaffold & material hoist for roof replacement & rooftop structure renovation. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change...
Install new chimney liner as per plans. no change in use, occupancy, or egress.
Existing 2 family building with interior renovation with partition work at the cellar, basement,1st and 2nd floor. no change in use, means of egress or occupancy