16,373 permits · NY · Brooklyn
Replacement of Roof Drains
General renovation of 1-family house with removing/new awning, partition and windows at porch of rear yard as per plan. no change in use, egress or occupancy.
Construction of subgrade utility structure for operations storage, non potable water facility and 1-story retail.
Proposed construction fence. no change to use, egress or occupancy under this application.
Installation of temporary construction fence
Modification to existing mezzanine framing to add new stair opening. framing for addition of a new 873 sf mezzanine floor. no change to egress, occupancy or use.
install non bearing partitions to create storage room, enclose boiler and hot water heater room and create bathroom with w.c. and lav only. no change in use, egress or occupancy. plumbing to be filed...
General renovation of 2-family building with removing partition, repairing walls, ceiling, new floor tiles, partition, door, replacing windows and painting as per plan. no change in use, egress or occ...
Floor opening infill at 1st floor level as per plans.
Use of monorail for curtain wall panels installation. This application is filed in conjunction with NB B00939362
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary needle and pipe scaffold beam as per plans. needle beam shall comply with the chapter #33 of the code. no changes in use egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of new sidewalk shed with pipe scaffold at 191 carlton avenue, brooklyn, as per plans. there will be no change in the use, egress, or occupancy under this application.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Renovation of existing basement, first and second floor with plumbing work: relocate kitchen and bathroom fixtures; new 3-pc bathroom,washer, dryer, boilers and hot water heaters in basement; no chang...
Installation of solar pv system. no change to use, egress, or occupancy.
Application filed herewith to correct pw3 cost amount established under job application: 321555063. no change of use, egress, or certificate of occupancy.
Interior renovation for an existing two family dwelling. new partition walls, finishing flooring, new interior doors, new, tiles and new plumbing fixtures as per plans. legalize rear extension. no cha...
Installation of new concrete and steel elements for alteration of existing basement and cellar supports walls and piers. repair of existing damaged basement wood floor framing and existing rear one-st...