16,373 permits · NY · Brooklyn
Proposed plumbing work in conjunction with dob now job number b01358575-i1
APPLICATION TO FILE TO RENOVATE EXISTING 2ND FLOOR OF THE BUILDING-Plumbing work. APPLICATION FILED IN CONJUNCTION WITH ALT. 1 NYC DOB JOB#300246570 FOR NEW C Of O. PROPOSED USE: NO CHANGE-ONLY RENOVA...
PROPOSED: Interior renovation at cellar level, new bench footing, vapor barrier, new tiles, replace old metal columns with new 4 Column, new reinforced concrete spread footing. Lower the lavel of cell...
Mechanical worktype filed for Generator filed separately under subsequent filing B01083521-Z1.
Installation of new supplemental cooling split system in 1st floor kitchen and surrounding area of Cafeteria.
File structural application in conjunction with alt-co nb job # b01174363-i1.
proposed installation of a new emergency generator on the site, as per the plan. No changes to use, occupancy, or egress.
Suspended scaffold outrigger system for exterior facade repairs work at 802 dean street, brooklyn.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Install exterior non-illuminated wall sign (the tiny scientist)
Proposed structure work type for horizontal & vertical extension to establish a 3-story building w/ penhouse & basement, in conjunction with alt-co application number b00887998-i1
General renovation of existing residential building with, repair/new partition, door, ceiling, floor, and painting work. no change in use, means of egress or occupancy.
Installation of temporary construction fence as per plans. no change in use, occupancy, or egress under this application.
Structural framingon cellar thru roof of residential town house as per plan. No change to use, egress or occupancy under this application.
Interior renovation of existing 4 family 4 story building. no change of use, egress or occupancy.
Proposed 4-story masonry and steel hereafter erected class a 5-family multiple dwelling.
MH work as per plans filed
Removal of Sprinkler System throughout building in conjunction with full demolition. No change in egress, use, or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of solar panels, rooftop, grid tied, railed, 17 modules, 7.395 KW