168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of heavy duty sidewalk shed as per drawings during general construction work. no change in use, egress, or occupancy. sidewalk shed to comply with chapter 33 of nyc bu…
Installation of sidewalk shed as indicated on the attached drawnings. There are no changes in use, egeress or occupancy.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Installation of temporary suspended scaffolds and material hoist on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and…
Subsequent filing for plumbing work type for the new two-family building.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of 37.605 kw solar energy system on roof. No change of occupancy, use or egress.
Roof hoist installed in order to lift material to perform facade repairs. sidewalk shed filed under separate application.
Interior renovation of the 2nd and 3rd floor.
Modification to existing Verizon site. Replace 9 antennas and 6 RRHs, install new platform with related dunnage, remove 1 cabinet.
Subsequent filing for plumbing work type for the new two-family building.
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
Installation of wood construction fence in conjunction with application B01361705-I1
Reconfiguring of existing wet-type sprinkler system distributions throughout single family, simplex residential apartment no. 824 to accommodate interior alterations. no chnage in…
Alteration application filed herewith for new plumbing fixtures and associatedpiping for white demised community facility spaces. no change in egress, use, oroccupancy under this a…
Minor interior renovation to the first floor commercial store, including the installation of a new mechanical hood, ducts, and exhaust fan as per plan. no change in use, egress, or…
Proposed interior renovation to the 1st floor, to include new finishes, new partitions, new lighting, and plumbing fixtures.
Filing for ac units, the new commercial kitchen exhaust hoods, ductwork, blowers, maxigrill and aqe for commercial kitchen exhaust system and mua system, there is no change in use,…
Installation of 43.055 kw solar energy system on roof. No change of occupancy, use or egress.
Structural work to be conducted to install reinforced CMU wall, steel beam and cfs joist with concrete slab on metal deck, and cfs load bearing wall.
Installation of 45.78 kw solar energy system on roof. No change of occupancy, use or egress.