168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New Structural System to Support Platform and new Piping for HCU Lopa Project
Addition to ex. sfd for attached accessory dwelling unit per gcs 66323(a)(1). addition to ex. sfd for new bedroom and remodel to create new bathroom.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 40 Squares. Class A roof covering is required within Very High Fir…
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very Hig…
2025 wildfire rebuild, single-family dwelling, (1)-story, _44'-8"_x_50'_ w/ detached garage. nfpa 13(d) sprinklers throughout. eo8
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New two story accessory dwelling unit addition to existing triplex per lamc 12.22.a.33 (c) and (e)
Eplan - new 2 story duplex , ab2097 no parking required
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very Hig…
9 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is require…
Eplan: Demolition 1-story SFD and detached Garage"COMPLY WITH DEPARTMENT ORDER effective date 06/08/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
Convert (e) detached garage to adu with storage per state law
Supplemental to permit 16010 - 40000 - 03498 for previously approved new detached 3 car garage to provide updated floor area calcs, reflect as-built structural conditions & documen…
Supplemental permit to #26016-90000-12553 to change the address from 18132 w andrea circle south to 18120 w andrea cirle south. no change in legal.
15 Window change-out (same size & type) for residential buildings. Dual glazing, labeled andcertified by National Fenestration Rating Council (NFRC), is required for doors and wind…
Grading for new affordable housing apartment
Restucco and replace damaged footing to the (e) sfd.
Supplemental ref to pcis # 26016-30000-04009, to add standing shower on 2nd floor bahtroom and convert the tub to standing shower on 3rd floor bahtroom.
Proposed 26'-6" x 30' detached a.d.u. at rear of lot per gcs 66323(a)(2) construction per w.f.p.p.
Eplan. remodel to (e) sfd
Supplemental to 24016-20000-34857 to relocate laundry to garage. add new exterior door at garage.