168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings.
Re-stucco for residential buildings. Area = 1200 sqft.2 bathroom(s).Bathroom remodel for residential buildings (no structural changes).Replace drywall (no new walls added) for sing…
Supplemental permit to 26047-20000-00483 to revise the layout for spa
*eplan* Remodel and 1st and 2nd story addition to (E) SFD w/ (E) att garage. Conversion of (E) enclosed patio to main SFD. Attached wood trellis with BBQ area. NFPA 13D sprinklers.
Install radiant barrier and/or insulation in attic for residential buildings.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 21 Squares. Class A roof covering is required within Very Hig…
Eplan - ADU IB - P/BC 2023-150 --- Conversion of the second floor of an (e) two story duplex into attached ADU built prior to Jan 1 2020 to an Accessory Dwelling Unit
Eplan- new detached accessory dwelling unit per per gc 66323(a)(2). all work per wfpp
****2025 wildfire rebuild eo8 eligible project****new irregular shaped 2-story sfd w/ 2-car garage. nfpa 13d fire sprinklers throughout. all work per engineering.
Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings.
Supplemental to 25010-20000-01336 to revise the overall building height from 39.58' to 41.62'
Build new monopole 14x48 double sided digital billboard with an overall height of 77' on Metro owned property. This is part of the Metro TCN Ordinance.SPI UNDER 24048-10000-01100
New detached 1 story accessory dwelling unit (1008 s.f.) per lamc
ePlan. Removing Existing Fiberglass Pool and Installing New Shotcrete Pool per standard plan #268
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applica…
Excavation for new pool
conversion of (e) ALQ to SB9 unit, second story addition
Eplan - Existing garage to ADU conversion with an addition per GC 66323(a)(2) AND engineer design
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___40___Squares. Class A roof covering is required within Very High Fire Haz…
Demolition of detached garage