14,805 permits · CA · Los Angeles
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Los Angeles Building C...
Eplan. Supplemental permit to 25016-20000-08656 to revise restroom layout. Work includes changing the toilet from wall-hung to floor-mounted per site conditions and to remove non-required urinal to ac...
**2025 wildfire project** eo1- new one story detached two car garage rebuild like-for-like at the rear of the lot.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over existing solid sheathing __29____Squares. Class A roof covering is required withinVery High Fire Hazard Sev...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __22__Squares. Class A roof covering is required within Very High Fire Hazard Sev...
Remove and reccompact under the building for new sfd and detached adu
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 43 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Los Angeles Building C...
EPLAN CONVERT (E) RECREATION ROOM TO AN ACCESSORY DWELLING UNIT PER 66323(a)(3) WITHIN (E) 3 STORY DUPLEX.NFPA 13D FIRE SPRINKLERS THRU-OUT.
Interior early start demo non-structural demo. levels 1 through level 4 and parking levels.
Supplemental permit to 25010-10000-03108 to change permit from Contractor to Owner builder: Jeremy Kaye
(8) Window and (3) door change-out (same size & type) for residential buildings. Dual glazing, labeled andcertified by National Fenestration Rating Council (NFRC), is required for doors and windows re...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 35 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Complete work done under previously expired permit #21010-20000-06460. Work is 75% complete (minimum 75% completed as determined by inspection).
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 27 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Excavation for new pool and spa.
Earthquake retrofit anchor bolt installment with engineer's details.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over existing solid sheathing __18____Squares. Class A roof covering is required withinVery High Fire Hazard Sev...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing_28_____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (V...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 6 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com