15,072 permits · CA · Los Angeles
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 8 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zon...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zo...
(n) two story ground floor addition to (e) one story sfd to become a two story sfd w/ attached garage at the front. nfpa 13d fire sprinklers required throughout.
Eplan - ADDITION AND CONVERT EXISTING DETACHED GARAGE TO ACCESSORY DWELLING UNIT PER STATE ADU GC 66323(a)(2).
Eplan: Supplemental to 25014-10000-02775 To Revise the deck foundation.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 22 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 11 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Tenant improvement for business school on the 8th floor of tower 2. the tenant improvement projects consists of three separate suites.
NEW DETACHED 1-STORY ACCESSORY DWELLING UNTI WITH ROOF DECK PER LAMC 12.22A.33(c)-(d).
2025 wildfire rebuild, supplemental to permit no. 25010-30000-04174 to capture 30.5 sq. ft. addition to 2nd floor deck, revise structural framing plans, and minor interior changes. eo1 eligible.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft.over new solid sheathing ___33___Squares. Class A roof covering is required withinVery High Fire Hazard Severity...
Supplemental permit to 25014-20000-03792 to revise framing and foundation plan.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 34 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
REMODEL TO (E) DETACHED GARAGE WITH ADDITION AND TO CONVERT A PORTION OF 1ST FLOOR TO BE PART OF THE ACCESSORY DWELLING UNIT AND ADDITION AT 2ND FLOOR TO CREATE AN ACCESSORY DWELLING UNIT TO COMPLY WI...
Grading to backfill (e) swimming pool with structural compacted fill
Bathroom remodel for residential buildings (no structural changes)"COMPLY WITH DEPARTMENT ORDER effective date 02/10/2023. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
1 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and wind...
Kitchen/bathroom (2) remodel for residential buildings (no structural changes).
Window (4) and door (2) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows r...
Eplan. Adding sliding door, replacing old framing at (e) kitchen area and convert (e) closet into full bathroom. "Comply with department order effective date 12/29/25. Permit will expire 30 days from...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com