15,162 permits · CA · Los Angeles
eplan: Initial TI, PROPOSED CHANGE OF USE FROM RETAIL TO RESTAURANT NEW NON-LOAD BEARING WALLS, NEW BAR, AND KITCHEN. NO OUTDOOR DINING.
(1) bathroom remodel for residential buildings (no structural changes). MEPs Included
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing ( 20 ) Squares. Class A roof covering is required within Very High Fire Hazard Se...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing (5 ) Squares. Class A roof covering is required within Very High Fire Hazard Severity...
ePlan. Remodel to (e) SFD to add a bathroom, remodel (e) bathroom and kitchen
Fiber Cement siding over solid sheathing with an approved water-resistive barrier per valid ICC Evaluation Report # 2290 on exterior walls at 5 feet or more from property lines for residential buildin...
Tenant Improvement of a synagogue/assembly in eldercare facility (approved under core & shell permit 21010-10000-04431)
3 ILLUMINATED WALL SIGNS per ADM-2025-6336-OVRSIGN 2 WITH DIM 33 1/2"H X 21' 1/4"" W @ 58.68 SQ FT LOCATED 16'-2" A.F.F.SIGN 3 WITH DIM 30"H X 18' 4 1/16"W @ 45.85 SQ FT LOCATED 16' 8" A.F.F.SIGN 4 WI...
New 2-story duplex w/habitable basement per sb9 and attached 3-car garage, nfpa 13d sprinklers throughout, all work per engineering
ePlan. Remodel of Existing 2-Story Single Family Dwelling. Work Per Engineered Design. (No Change in Floor Area)
3 bathrooms remodel like for like no structural changes
Remove & replace existing drywalls as existed in unit #12 per plan.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 8 Squares. Class A roof covering is required within Very High Fire Hazard Severit...
Proposed 21'-5" x 31'-7" irregular shaped 2nd floor addition and major remodel to (e) sfd. nfpa 13d fire sprinklers throughout. all work per engineering.
Repair of Second-floor exterior elevated elements Repairing joists and railing connection.
Eplanb New Detached ADU per GC 66323(a)(2) . Design per EOR
eplanRemodel Kitchen, Bedroom, Bathroom, enclose breezeway in existing single family dwelling per Engineer.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 23 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Remodel the (e) pool. raise floor depth from 7'-7" to 5'-6".
Kitchen and 2 bathroom remodel for residential buildings (no structural changes)9 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenest...