25,100 permits · NY · Manhattan
Installation of mechanical systems and commercial cooking system in kitchen as per plans. No change in egress, occupancy, or use. In conjunction with M00945537, M00928456, M00928394.
Modification to existing sprinkler system as indicated on plans
Installation of single-dual personnel/material hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applic...
Renovation of existing cellar, first fl store & second floor apartments. Work to include replacement of existing windows, non-structural interior demolition, new partitions, new ceilings, and finishes...
Replacement of chiller and dedicated outside air unit.
Installation of a material hoist as per drawings. hoist shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Modification of mechanical systems on parts of Sub Cellar, Cellar, mezzanine, 23, 24, 51, 52 and Roof as indicated on attached plans. There is no change in occupancy, use or egress.
Herewith filing for structural demolition work as per plans. no change to use egress or occupancy under this application.
Interior renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Interior renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Interior renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Interior renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Interior renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Plumbing work at cellar filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new booster pump and hot water heaters. no change...
Interior renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Plumbing work filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new sanitary, storm, domestic water, sanitary vent and gas p...
Dev.Hub Consultation 10/25/23. Application filed to erect 17 story new building.
Plumbing work in conjunction with renovation of 20-story nycha multiple dwelling in public areas. no change to use, egress or occupancy.
Plumbing work in conjunction with renovation of 20-story nycha multiple dwelling in public areas. no change to use, egress or occupancy.
Foundation work as per plans filed.