168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Herewith filing railing replacement, metal stair replacement, ladder attachment, minor structural repairs as per plans. No change in use, egress or occupancy
Filed herewith underground plumbing work only as per plans filed. Filed in conjunction with NB # 121207504.
One story horizontal extension at second floor rear andinterior alterations. no change of use, egress or occupancyunder this application. pl, mh will be filed under dob nowbuild an…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Convert multi-family townhouse to single-family townhouse
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
structural work associated with the townhouse renovation as shown on plans filed herewith. no change to use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Install temporary pipe scaffold for exterior repairs as per drawings. pipe scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress un…
Proposed temporary outriggers system installation for facade repairs. no change in use, egress, or occupancy.
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during general construction work. no change in use, egress and occupancy. sidewalk shed and…
Installation of 300 psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under t…
The replacement of the existing roof membrane assemblies with a new multi-ply modified bitumen roofing membrane system, new flashing, brickwork, and the installation of new railing…
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Installation of new sidewalk shed and pipe scaffolding as indicated on plans. there will be no change in the use, egress, or occupancy under this application
Renovation of ground floor storefront. scope of work is limited to the ground floor facade. replacement of existing doors at front facade and rear yard work. no change to use, egre…
Herewith Filing for the removal of an existing mezzanine (MZ1) as refenced on plans .
Temporary Installation to be used on a temporary event Nasdaq_INNIO. All the Installations are to be removed upon completion of the event.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.