25,100 permits · NY · Manhattan
CHNY North EOS X-Ray: Remove and install new plumbing piping and fixtures on 3rd floor in the existing Hospital building as per plans filed herewith only.
Herewith filing for structural removals as per plans. no change to use, egress or occupancy under this application.
Structural and construction work to replace existing first floor and eighth floor rtu's with split systems. New cassettes to be installed at first and eighth floors. See mechanical drawings. Demolitio...
Interior renovation on first to fifth floor of an existing prior-to-1968, 5-story, class3-nfp old law tenement multiple dwelling as per plan. no change in use, egress and occupancy.
Respectfully request to file Post Approval Amendment (PAA P2) for word change (Back-flow Preventer location- Cellar. No change in use, egress, or occupancy.
Plumbing work filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new sanitary, storm, domestic water, sanitary vent and gas p...
Plumbing work filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new sanitary, storm, domestic water, sanitary vent and gas p...
Plumbing work filed in conjunction with renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: installation of new sanitary, storm, domestic water, sanitary vent and gas p...
Plumbing work filed in conjunction with renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: installation of new sanitary, storm, domestic water, sanitary vent and gas p...
Interior renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Interior renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes...
Interior renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fxitures on existing rough-in. no change in use, egress or occ...
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior and exterior renovations to existing building including installation and replacement of finishes, minor masonry repairs and facade work. No change in use, egress or occupancy.
Interior removal of walls, doors, floor finishes, and ceilings on all floors; removal of windows and non-structural masonry wall infill; roof waterproof membrane assembly to the existing roof slab; an...
Installation of existing deployable stage roof, temporary performance platform, bleachers, decking, tenting. No alteration to existing structures for Summer Stage Concerts. A TPA permit is required.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of construction fence shed as per plan. no change in use, egress or occupancy.
interior demolition of cellar through 5th floors. No structural demolition.