25,100 permits · NY · Manhattan
Alt. GC filed for interior renovation demo and to erect new non-load-bearing partition, doors, flooring, millwork and finishes. No change in use, egress and occupancy.
Minor interior renovation of suite 711. no change to use, occupancy or egress.
Mechanical modifications taking place on the 20th floor as indicated on the drawings.
Installation of temporary construction barriers as per plan. no change in use, egress or occupancy.
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of supported scaffolding for facade repairs.
Conversion of an existing two-family townhouse into a single-family residence. Proposed work includes the interior renovation and reconfiguration of existing spaces, including the installation of new...
Remove and install ductwork associated with new tenant layout for Alo per plans filed herewith. no change in egress, use or occupancy.
provide pantry sinks for offices in conjunction with Alt #M01349165 as per plans filed
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Minor demolition. Installation of partitions, doors ceilings on the 13th floor (Buildout) as per plans. No change to use, egress or occupancy.
Remove existing non-load bearing wall and install new bi-fold door. no change in use, egress, or occupancy under filing.
Interior renovation to include demolition of existing and construction of new partitions for existing office space. no change in use, egress, or occupancy.
Relocate and provide new sprinkler heads on existing sprinkler system for existing office spaces in conjunction with Alt #M01349165 as per plans filed
Modifications to the existing sprinkler system on the 13th floor (Buildout) as per plans. No change to use, egress or occupancy.
Great hall gallery package 2. plumbing and sprinkler work as per plans filed herewith.
Structural work filed in conjunction with the eating & drinking establishment renovation as per plan. No change in use, egress, or occupancy under this application