25,100 permits · NY · Manhattan
Sprinkler work on the 42nd marketing floor(41st constructrion floor) as per plans filed. no change to use, egress or occupancy.
Change of use of dwelling unit to community facility use. general construction work to include reconfiguration of partitions and doors.
Facade repairs as indicated on the plans filed herewith. no change in use, egress, or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Installation of suspended scaffold for facade work or inspection.
Renovation of an existing duplex penthouse apartment. Architectural work as per plans. No change of use, occupancy or egress.
Facade repair which includes brick repointing,lintel replacement, brick replacement andsill replacement as per plans. no change inbuilding use, occupancy or egress.
Non-illuminated non-advertising double-face projecting accessory sign approved under nyc landmark preservation commission docket# 26-07473 - atm. no change of use, egress or occupancy.
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Reconstruction of Kitchen and Bathrooms and other minor work to conform to the original approved plans DOB Job #122854143. No change to use, egress or occupancy.
Removal of interior partition and replacement of wood deck with porcelain tile.
General construction modifications for interior demo work to the 12th floor as per plans filed herewith. No change in use egress or occupancy.
Installation of temporary indoor structures consisting of a scenic arbor, a decorative trellis, and a performance platform.
Interior removals work on the 24m/23c floor to include partition, ceiling, and door removals as per plans. no change of use, egress or occupancy.
Application for the installation and use of suspended scaffold
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.
Installation of supported scaffold in lobby area to reach ceiling as shown in drawings. no change in use, egress or occupancy.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com